Greenfield Textile 2.4 MW Rooftop Solar Plant
2.4 MWp
Installed Capacity
3.8–4.5 Yrs
Projected Payback
950+ Tons
Annual CO₂ Saved
14 Weeks
Turnkey Delivery
Project Overview
Dalo engineered and commissioned a 2.4 MWp rooftop solar plant across three manufacturing sheds, cutting daytime grid and diesel expenditure by 52% while offsetting 2,100 tons of CO₂ annually.
From initial structural load verification and electrical single-line diagrams to grid synchronization and staff handover training, Dalo executed the complete EPC scope under strict IEC safety compliance and transparent milestone reporting.
Key Engineering Deliverables
- 3D PVsyst irradiance & shading yield modeling
- Tier-1 monocrystalline modules with 25-year performance warranty
- Non-penetrating weatherproof structural mounting & surge protection
- Live SCADA / mobile app telemetry with proactive O&M support


Project Challenges
The factory operated 24/7 with corrugated metal roofing that required zero-leakage non-penetrating clamps and seamless PV-DG synchronization with four existing backup generators.
Our Solution & Verified Results
Our structural team deployed lightweight anodized aluminum seam-clamps and smart multi-generator controllers, completing the entire installation with zero production downtime.
Frequently Asked Questions
Based on verified generation logs from the first 6 months, full payback is projected in 3.8 years.
Every Dalo project carries a 25-year linear panel performance warranty, 5–10 year inverter coverage, and proactive scheduled cleaning plus remote performance diagnostics.
Yes. Share your recent electricity bills and site location through our Contact page, and our engineers will prepare a free custom yield simulation and financial ROI proposal.
Related Solar Projects
Explore more turnkey clean-energy deployments delivered by Dalo.
